Here are some of the major works and disruptions expected this Easter school holiday across Maidenhead, Cookham, Marlow, Slough, Windsor and more. MaidenheadHarvest Hill (Maidenhead, between Pinkneys Green and Furze Platt)Dates: March 30 to April 14Traffic management: Full road closureWorks: New sewer connection and chamber modifications for four housesWindsor Road (Maidenhead, between the town centre and Bray)Dates: March 30 to April 1Traffic management: Multi-way temporary traffic signalsWorks: Utility repair and maintenance works (Openreach)Ray Mead Road (Maidenhead, along the Thames near Boulters Lock)Dates: March 28 at 11.45am to April 1 at 5pmTraffic management: Multi-way temporary traffic signalsWorks: Utility repair and maintenance works (South East Water)Shoppenhangers Road (Maidenhead, near the A404 junction)Dates: March 30 to April 1Traffic management: Two-way temporary traffic signalsWorks: Trial holes for new development (Dig and Connect Water Services)Waltham Road (White Waltham, between Maidenhead and Twyford)Dates: March 28 at 9.30am to April 2 at 5pmTraffic management: Two-way temporary traffic signalsWorks: New electricity service connection (Scottish and Southern Power Distribution)TwyfordBath Road (near the Bird in Hand pub, roughly 0.4 miles along the A4)Dates: January 5 at 11.21am to September 25 at 6pmTraffic management: Two-way temporary traffic signals (three-way at junctions with Canhurst Lane and Linden Hill Lane)Works: Replacement of ageing water mains with new plastic pipes (Thames Water), carried out in phases along the A4 and side roadsTaplowBath Road (Maidenhead / Taplow, A4 corridor)Dates: March 30 to April 19Traffic management: Lane closureWorks: Gas pipe replacement works (Cadent Gas)Marsh Lane, near the bridge (Taplow)Dates: April 7 to April 10Traffic management: Full road closureWorks: Plane and patch (removal of damaged road surface and resurfacing)SloughBath Road (Slough, A4 corridor through the town)Dates: January 12, 2026 to September 18, 2028Traffic management: Lane closureWorks: Highway improvement works (Slough Borough Council – specific details not published)Wellington Street (Slough town centre)Dates: January 12, 2026 to September 18, 2028Traffic management: Lane closureWorks: Highway improvement works (Slough Borough Council – specific details not published)Stoke Poges Lane (Slough, north of the town centre)Dates: March 30 at 10.45am to April 19 at 11.59pmTraffic management: Full road closureWorks: Gas pipe replacement works (Cadent Gas)Farnham Road (Slough, between the town centre and Farnham Royal)Dates: March 28 at 8am to April 25 at 11.59pmTraffic management: Contraflow systemWorks: Utility works (euNetworks)CookhamHigh Road (Cookham, between Station Road, Worster Road and Whyteladyes Lane)Dates: March 30 to April 12Traffic management: Full road closure (phased sections)Works: Gas main replacement works (Cadent Gas), carried out in phases along different sections of the roadSutton Road (Cookham, linking High Road and the A4094)Dates: March 30 at 8.05am to April 12 at 11.59pmTraffic management: Full road closureWorks: Gas pipe replacement works (Cadent Gas)Ferry Lane / A4094 (Cookham, between the borough boundary and Sutton Road car park)Dates: March 30 to April 12Traffic management: Full road closureWorks: Gas main replacement works (Cadent Gas)MarlowHigh Street (Marlow, at Marlow Bridge)Dates: February 14 to April 26 (weekend closures only). Affected Easter dates: April 11 to April 12Traffic management: Full bridge closure (Saturday to Monday mornings on selected dates)Works: Bridge works requiring repeated weekend closuresFoxes Piece (Marlow, residential area near the town centre)Dates: February 28, 2025 to April 3, 2026Traffic management: Full road closure (24/7)Works: Road redevelopment worksHenley Road Service Road (Marlow, at the junction with Henley Road)Dates: March 2 to April 3Traffic management: Full road closureWorks: Drainage improvement works (including gully works)WindsorMaidenhead Road (east Windsor)Dates: March 23 at 9.32am to April 2 at 11.59pmTraffic management: Lane closureWorks: Utility repair and maintenance works (Scottish and Southern Power Distribution – specific details not published)Kings Road (Clewer Village, Windsor)Dates: March 28 at 9.30am to April 7 at 11.59pmTraffic management: Two-way temporary traffic signalsWorks: Utility repair and maintenance works (Scottish and Southern Power Distribution – specific details not published)Clewer Hill Road (Clewer and Dedworth, Windsor)Dates: March 30 at 11.38am to April 9 at 11.59pmTraffic management: Two-way temporary traffic signalsWorks: Emergency gas repair works (Cadent Gas)Dedworth Road (Dedworth, Windsor)Dates: March 28 at 8.07am to April 11 at 6pmTraffic management: Multi-way temporary traffic signalsWorks: New electricity service connection (Mua Electricity Limited)
Source: Express March 30, 2026 12:53 UTC