Line cut during railway eviction drive disrupts power supply to parts of Dhaka airport - News Summed Up

Line cut during railway eviction drive disrupts power supply to parts of Dhaka airport


Power connection remained intact in terminal 1 of the airport, he said about 2pm. “We are working to resume the connection," said Noor Mohammad, director in Dhaka Electric Supply Company or DESCO. The power cut hampered regular activities in the airport, according to people at the airport. There was a glitch in a water pump in the airport which was mended and also we used alternative ways to supply water. We ensured power supply using generator," he said.


Source: bd News24 July 21, 2019 13:52 UTC



Loading...
Loading...
  

Loading...

                           
/* -------------------------- overlay advertisemnt -------------------------- */