The Head of the Control Department at the General Electricity Company of Libya (GECOL) Abdel Rahaman Al-Jali said that the linking of the western and eastern electric grids will have positive results on all Libyan cities. “Libyans will sense the difference once a failure or a damage happens to a certain area while another will be operating with power, so the GECOL will provide the first area with power through the linkage with the second area.” He explained.
Source: Libya Observer February 11, 2017 17:26 UTC