Enbridge Inc. says it will restart the east segment of Line 5 in the Straits of Mackinac after winning approval from the U.S. Pipeline and Hazardous Materials Safety Administration and the Michigan Circuit Court. The Calgary-based company shut down both legs of the pipeline in June after noticing a disturbance to an underwater anchor supporting the eastern line. A 6.4-kilometre-long segment divides into two pipes that cross the bottom of the Straits of Mackinac, which connects Great Lakes Huron and Michigan. Enbridge says it has been assured by the pipeline administration that there are no integrity issues with Line 5.
Source: CBC News September 10, 2020 01:07 UTC