Auckland water agency estimates price tag of flood damage at over $250 million - News Summed Up

Auckland water agency estimates price tag of flood damage at over $250 million


"A designated team for recovery has been set up for long term recovery work, as some of the recovery will take about 18 months or more. Because of the sheer scale of the damage and the subsequent recovery work Watercare's board has asked for a monthly update on progress. Photo: Stuff / Abigail Dougherty via LDRThe Pukekohe water treatment plant was flooded on Auckland Anniversary Weekend and has been unable to operate since. Slips in Scenic Drive saw 3000 homes lose their water and Watercare's Rosedale wastewater treatment plant and Wairau pump station were also flooded. And according to Watercare, its Huia water treatment plant has been running at reduced capacity because the water entering the plant from the dams has high turbidity (dirtiness) which makes it harder to treat.


Source: Stuff March 06, 2023 21:33 UTC



Loading...
Loading...
  

Loading...