[BREAKING] Kenya Cancels Controversial KSh95.68 Billion Power Project Deal With Adani - News Summed Up

[BREAKING] Kenya Cancels Controversial KSh95.68 Billion Power Project Deal With Adani


Kenya has cancelled the controversial KShs 95.68 Billion (USD 736m) deal with Adani Energy Solutions for the development of transmission lines and sub-stations. As part of this infrastructure development, Adani was to raise all the funding in the form of debt and equity that will be repaid over the 30 years of the project agreement. 220kV Rongai-Keringet-Chemosit Line: Covering 99.98 km, this line will include substations at Rongai, Keringet, and Chemosit. 132kV Menengai-Ol Kalou-Rumuruti Line: A 89.88 km line with substations at Menengai, Ol Kalou, and Rumuruti. 400kV (Double-Circuit) Gilgil-Thika-Malaa-Konza Line · 220kV Rongai-Keringet-Chemosit Line · 132kV Menengai-Ol Kalou-Rumuruti Line · 400/220kV Substation at Lessos · 132/33kV Substation at Thurdibuoro.


Source: Daily Nation November 21, 2024 13:18 UTC



Loading...
Loading...
  

Loading...