File photo of Padma Bridge which is under construction since December 7, 2014 Dhaka TribuneThe 6.15km-long bridge will have 41 spans, each of 150mAnother span of the Padma Bridge is due to be installed this month. Engineers of the Padma Bridge Project confirmed the news to the Dhaka Tribune. Five spans of the Padma Bridge have been permanently installed at the Jajira point; while one span has been temporarily installed at the Mawa point. After span 6F is installed at the Jajira point, a total 900 meters of the bridge will be visible from Jajira point. One-and-a-half months after span 6F is installed, another span will be installed."
Source: Dhaka Tribune January 07, 2019 06:22 UTC