The widened gap between two spans on the concrete bridge across river Kallada at Enathu, near Adoor, on which repair work is being undertaken. more-inThe Kerala State Transport Project (KSTP) have started preparatory work to replace the damaged rubber bearings of the concrete bridge across river Kallada at Enathu, near Adoor, on MC Road on Wednesday. The KSTP experts, led by Chief Engineer P.K. Geetha G.S., the KSTP Executive Engineer, told The Hindu that experts in bridge repair had already started the work to replace the bearings. Ms Geetha said vehicular traffic on the bridge would be completely stopped once the beading replacement work started.
Source: The Hindu January 12, 2017 03:45 UTC