After completing the construction of 29.7km metro corridor from Noida to Greater Noida, Delhi Metro Rail Corporation (DMRC) will also handle the operations of this line for five years. All the U-girders were pre-fabricated at the two casting yards in Noida Sector 149 and the depot station in Greater Noida. A foot overbridge will connect Sector 52 metro station on the Noida City Centre to Sector 62 corridor with Sector 71 Metro station on the Noida-Greater Noida corridor. A model of the Noida to Greater Noida Metro rail project, which is being built by the Delhi Metro. Metro depot: The metro depot which is under construction has 16 stabling lines, which can house total of 32 trains.
Source: Hindustan Times March 02, 2017 17:26 UTC