Brief Description Of The Project:The work execution requires installation of the new water disposal for the Tibisti main station. This work includes the main following works: Modifications works required to the existing de-salters vessels . Electrical installation works required for the systems at both stations. Provide a copy of the following legal documents:• Valid license compatible with the required work. • Previous experience in similar work, HOO has the right to disqualify any company that does not have sufficient experience in the work required.
Source: The North Africa Journal December 13, 2020 10:52 UTC