NHA to install temporary bridge in Hunza within a month - News Summed Up

NHA to install temporary bridge in Hunza within a month


The National Highway Authority (NHA) has announced to install a temporary bridge at Hunza’s Hassanabad after an RCC bridge was swept away by a glacial lake outburst flood (GLOF). Following the directives of Prime Minister Shehbaz Sharif, the NHA chairman along with engineers paid an emergency visit to the site of the affected Hassanabad bridge in Hunza Valley. The NHA spokesperson said that the Hassanabad bridge was completely destroyed, whereas, the government decided to install a temporary bridge within a month. Yesterday, horrific footage surfaced that showed the moment the RCC bridge collapsed in Gilgit’s Hunza Valley. The RCC bridge constructed in Hassanabad village of Gilgit’s Hunza Valley had collapsed after the scaffolding due to water flow from a glacier.


Source: The Nation May 09, 2022 06:29 UTC



Loading...
Loading...
  

Loading...

                           
/* -------------------------- overlay advertisemnt -------------------------- */