MANILA, Philippines — The Luzon grid will be placed under yellow alert on Tuesday afternoon, beginning 1 p.m. to 4 p.m, the National Grid Corporation of the Philippines (NGCP) announced. According to the NGCP, seven power plants went on a forced outage. Ltd; Southwest Luzon Power Generation Corp. 1, 3, and 4; GN Power Mariveles Coal Ltd. Co. 1 and 2; and Calaca 2. The NGCP said the operating requirement on Monday stood at 11,385 megawatts as against 12,251 megawatts of available capacity. Luzon grid status, 21 June 2022: Yellow Alert1:00PM – 4:00PM Operating Requirement: 11,385MWAvailable Capacity: 12,251MWNet Operating Margin: 412MWhttps://t.co/z54cqQRKyZ — NGCP (@NGCP_ALERT) June 21, 2022RELATED STORY:Luzon grid placed under red alert causing power outagesEDVSubscribe to our daily newsletter By providing an email address.
Source: Philippine Daily Inquirer June 21, 2022 09:51 UTC