Line inspection between Nelamangala, Shravanabelagola ends - News Summed Up

Trending Today


Line inspection between Nelamangala, Shravanabelagola ends


The CSR inspection of the railway line was completed on Friday.— Photo: By Special ArrangementBy Special ArrangementThe inspection of the 110-km railway line between Nelamangala and Shravanabelagola by the Commissioner of Railway Safety (CRS) was completed on Friday. Manoharan, Commissioner of Railway Safety (Bengaluru), conducted the five-day inspection, which began on February 6. Mr. Manoharan, speaking to presspersons at Shravanabelagola, said that the track condition was okay but there were minor issues with regard to other things. The line connecting Hassan and Bengaluru via Shravanabelagola was proposed 20 years ago when H.D. An engineer with SWR construction wing however said only one level crossing exists near Soladevanahalli, off Nelamangala, which can be eliminated.


Source: The Hindu February 11, 2017 00:33 UTC



Loading...
Loading...
  

Loading...

                           
/* -------------------------- overlay advertisemnt -------------------------- */