The water utility noted it had completed the repair of an emergency leak on Coastal Road at 9:40 p.m. Monday, after a blow-off valve of its 1.4-meter primary line broke because of high water pressure. Water services supposed to have returned by 8 p.m. Monday. ADVERTISEMENT“However, the valve along Kabihasnan [in Parañaque] could not be fully opened to let the water flow through the primary line,” Maynilad said in a statement on Tuesday. Emil San Pedro of Imus asked Maynilad to “act on their own” to deploy water tanks in affected communities. Rosa II, Salcedo I, Salcedo II, San Juan I, San Juan II, Magdiwang, San Antonio I and San Antonio IIRosarioBarangays Bagbag I, Bagbag II, Poblacion, Silangan I, and Silangan IIKawitBarangays Balsahan-Bisita, Tramo-Bantayan, Manggahan-Lawin, Congbalay-Legaspi, Samala-Marquez, Pulvorista, Binakayan-Aplaya, Binakayan-Kanluran, and Toclong/atm
Source: Philippine Daily Inquirer March 06, 2018 13:30 UTC