Islamabad – The government will install Floating Solar Photovoltaic (FPV) with the capacity of upto 340MW on Tarbela reservoir and Ghazi Barotha Hydropower Generation Complex, it is learnt reliably here on Tuesday. According the source, under the first project Floating Solar Photovoltaic (FPV) with the generation capacity of 300MW will be installed at two different locations of Ghazi Barotha Hydropower Complex. The source said that the World Bank (WB) has agreed to provide Rs56.697 billion for the installation of 300MW Floating Solar Photovoltaic (FPV) on Water Bodies in Ghazi Hydropower Generation Complex. The total cost of the project is Rs59.775 billion and the World Bank has provided commitment financing the 300MW Solar FPV Project at Ghazi Barotha ponds through soft loan. The source said that first the PC-I for the installation of 300MW Floating Solar Photovoltaic (FPV) on Water Bodies in Tarbela Ghazi Hydropower Generation Complex would be presented to the Central Development Working Party for approval.
Source: The Nation May 18, 2022 11:24 UTC