more-inWith the aim of easing traffic congestion in the Pantheon Road junction, the Chennai Corporation removed the Si. However, in the absence of proper signage, motorists, especially those who are unfamiliar with the area, are at their wits end over the barricades installed by the traffic police and have difficulty navigating the roundabouts. An estimated 10,000 vehicles pass through the junction from Pantheon Road, Police Commissioner office Road, Rukmani Lakshimipathy Road and Adithanar Road. Assistant Commissioner of Police Elangovan told The Hindu, “The Chennai Corporation is working to introduce a proper system. We have installed iron barricades to make island-like structures in the middle of the junction.
Source: The Hindu June 27, 2017 18:52 UTC