"It's not only the bridge ... going over the Queensway, but we have a north and a south ramp that are quite large," Murphy said. The bridge was one of the first to cross a 400-level highway when it first opened in the 1960s. Make bike lanes permanent, Leiper urgesThe detour includes temporary segregated bike lanes running north and south on either side of Holland Avenue between Kenilworth Street and Byron Avenue. Jeff Leiper said he hopes the temporary bike lanes won't just be used by people detouring around the construction. The new, covered steel bridge structure will be installed in another 17-hour weekend closure overnight Sept. 22-23, also this year.
Source: CBC News March 28, 2018 10:41 UTC