By Lo Hsin-chen and Dennis Xie / Staff reporter, with staff writerThe Pingtung County Government on Tuesday said that its pioneering green embankment project is to be expanded following the venture’s initial success. The county government launched the 2 megawatt (MW) project last year, installing solar panels along a 2km section of the Lili River (力力溪) embankment. “The Lili River solar project makes the county the first in Taiwan to produce energy on an embankment,” Pingtung County Commissioner Pan Men-an (潘孟安) said. The county has built solar farms at sea, promoted power generation from biomass and ocean currents, and placed solar panels in detention basins in an effort to support the central government’s renewable energy policies, Pan said. The planned expansion would increase the installation of solar panels to a 2.4km section of the embankment, with a total power generation capacity of 2.5MW, Chiang said.